Intersection of http://terminology.hl7.org/CodeSystem/v3-CalendarType and http://terminology.hl7.org/CodeSystem/v3-CalendarType

This is the CodeSystem that contains codes in both CalendarType (http://terminology.hl7.org/CodeSystem/v3-CalendarType) and CalendarType (http://terminology.hl7.org/CodeSystem/v3-CalendarType).

Structure

Generated Narrative: CodeSystem 92b1373f-8aa2-4cd6-a494-1d9ca4d268db-2199

Properties

This code system defines the following properties for its concepts

NameCodeURITypeDescription
internalIdinternalIdhttp://terminology.hl7.org/CodeSystem/utg-concept-properties#v3-internal-idcodeThe internal identifier for the concept in the HL7 Access database repository.
Statusstatushttp://hl7.org/fhir/concept-properties#statuscodeDesignation of a concept's state. Normally is not populated unless the state is retired.
internalIdinternalIdhttp://terminology.hl7.org/CodeSystem/utg-concept-properties#v3-internal-idcodeThe internal identifier for the concept in the HL7 Access database repository.
Statusstatushttp://hl7.org/fhir/concept-properties#statuscodeDesignation of a concept's state. Normally is not populated unless the state is retired.

Concepts

This code system http://hl7.org/fhir/comparison/CodeSystem/92b1373f-8aa2-4cd6-a494-1d9ca4d268db-2199 defines codes, but no codes are represented here

CodeDisplayDefinitioninternalIdStatusinternalIdStatus
GREG GregorianThe Gregorian calendar is in effect in the most countries of Christian influence since approximately 1582. This calendar superceded the Julian calendar.10683, 10683active, active10683, 10683active, active