CodeSystem Comparison between http://terminology.hl7.org/CodeSystem/v2-0472 vs http://terminology.hl7.org/CodeSystem/v2-0472

Messages

Metadata

NameValueComments
.caseSensitivetrue
    .compositionalfalse
      .contentcomplete
        .copyrightThis material derives from the HL7 Terminology (THO). THO is copyright ©1989+ Health Level Seven International and is made available under the CC0 designation. For more licensing information see: https://terminology.hl7.org/license
          .date2019-12-01
            .descriptionHL7-defined code system of concepts specifying that a second timing specification is to follow using the repeat delimiter. Used in HL7 Version 2.x messaging in the TQ1 segment.
              .experimentalfalse
                .hierarchyMeaningis-a
                  .jurisdiction
                    .nameTqConjunctionId
                      .publisherHealth Level Seven International
                        .purposeUnderlying Master Code System for V2 table 0472 (TQ Conjunction ID)
                          .statusactive
                            .titletqConjunctionId
                              .urlhttp://terminology.hl7.org/CodeSystem/v2-0472
                                .version2.0.0
                                  .versionNeededfalse

                                    Concepts

                                    CodeDisplaystatusdeprecatedv2-concCommentv2-concCommentAsPubstatusdeprecatedv2-concCommentv2-concCommentAsPubComments
                                    .SSynchronousAADo the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.AADo the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.
                                      .AAsynchronousAADo the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.AADo the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.
                                        .CActuation TimeAAIt will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).AAIt will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).