This page is part of the HL7 Terminology (v5.2.0: Release) based on FHIR R4. This is the current published version in its permanent home (it will always be available at this URL). For a full list of available versions, see the Directory of published versions
Active as of 2019-12-01 |
{
"resourceType" : "CodeSystem",
"id" : "v2-0472",
"text" : {
"status" : "generated",
"div" : "<div xmlns=\"http://www.w3.org/1999/xhtml\"><p><b>Properties</b></p><p><b>This code system defines the following properties for its concepts</b></p><table class=\"grid\"><tr><td><b>Code</b></td><td><b>URI</b></td><td><b>Type</b></td><td><b>Description</b></td></tr><tr><td>status</td><td>http://terminology.hl7.org/CodeSystem/utg-concept-properties#status</td><td>code</td><td>Status of the concept</td></tr><tr><td>deprecated</td><td>http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-table-deprecated</td><td>code</td><td>Version of HL7 in which the code was deprecated</td></tr><tr><td>v2-concComment</td><td>http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concComment</td><td>string</td><td>V2 Concept Comment</td></tr><tr><td>v2-concCommentAsPub</td><td>http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentAsPub</td><td>string</td><td>V2 Concept Comment As Published</td></tr></table><p><b>Concepts</b></p><p>This code system <code>http://terminology.hl7.org/CodeSystem/v2-0472</code> defines the following codes:</p><table class=\"codes\"><tr><td style=\"white-space:nowrap\"><b>Code</b></td><td><b>Display</b></td><td><b>Definition</b></td><td><b>V2 Concept Comment</b></td><td><b>V2 Concept Comment As Published</b></td></tr><tr><td style=\"white-space:nowrap\">S<a name=\"v2-0472-S\"> </a></td><td>Synchronous</td><td>Synchronous</td><td>Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.</td><td>Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.</td></tr><tr><td style=\"white-space:nowrap\">A<a name=\"v2-0472-A\"> </a></td><td>Asynchronous</td><td>Asynchronous</td><td>Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.</td><td>Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.</td></tr><tr><td style=\"white-space:nowrap\">C<a name=\"v2-0472-C\"> </a></td><td>Actuation Time</td><td>Actuation Time</td><td>It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).</td><td>It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).</td></tr></table></div>"
},
"extension" : [
{
"url" : "http://hl7.org/fhir/StructureDefinition/structuredefinition-wg",
"valueCode" : "oo"
}
],
"url" : "http://terminology.hl7.org/CodeSystem/v2-0472",
"identifier" : [
{
"system" : "urn:ietf:rfc:3986",
"value" : "urn:oid:2.16.840.1.113883.18.300"
}
],
"version" : "2.1.0",
"name" : "TqConjunctionId",
"title" : "tqConjunctionId",
"status" : "active",
"experimental" : false,
"date" : "2019-12-01",
"publisher" : "HL7, Inc",
"contact" : [
{
"telecom" : [
{
"system" : "url",
"value" : "http://www.hl7.org/"
}
]
}
],
"description" : "HL7-defined code system of concepts specifying that a second timing specification is to follow using the repeat delimiter. Used in HL7 Version 2.x messaging in the TQ1 segment.",
"purpose" : "Underlying Master Code System for V2 table 0472 (TQ Conjunction ID)",
"copyright" : "Copyright HL7. Licensed under creative commons public domain",
"caseSensitive" : true,
"valueSet" : "http://terminology.hl7.org/ValueSet/v2-0472",
"hierarchyMeaning" : "is-a",
"compositional" : false,
"versionNeeded" : false,
"content" : "complete",
"property" : [
{
"code" : "status",
"uri" : "http://terminology.hl7.org/CodeSystem/utg-concept-properties#status",
"description" : "Status of the concept",
"type" : "code"
},
{
"code" : "deprecated",
"uri" : "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-table-deprecated",
"description" : "Version of HL7 in which the code was deprecated",
"type" : "code"
},
{
"code" : "v2-concComment",
"uri" : "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concComment",
"description" : "V2 Concept Comment",
"type" : "string"
},
{
"code" : "v2-concCommentAsPub",
"uri" : "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentAsPub",
"description" : "V2 Concept Comment As Published",
"type" : "string"
}
],
"concept" : [
{
"id" : "4869",
"code" : "S",
"display" : "Synchronous",
"definition" : "Synchronous",
"property" : [
{
"code" : "v2-concComment",
"valueString" : "Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An \"S\" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day."
},
{
"code" : "v2-concCommentAsPub",
"valueString" : "Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An \"S\" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day."
},
{
"code" : "status",
"valueCode" : "A"
}
]
},
{
"id" : "4870",
"code" : "A",
"display" : "Asynchronous",
"definition" : "Asynchronous",
"property" : [
{
"code" : "v2-concComment",
"valueString" : "Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of \"A\" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday."
},
{
"code" : "v2-concCommentAsPub",
"valueString" : "Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of \"A\" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday."
},
{
"code" : "status",
"valueCode" : "A"
}
]
},
{
"id" : "4871",
"code" : "C",
"display" : "Actuation Time",
"definition" : "Actuation Time",
"property" : [
{
"code" : "v2-concComment",
"valueString" : "It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported)."
},
{
"code" : "v2-concCommentAsPub",
"valueString" : "It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported)."
},
{
"code" : "status",
"valueCode" : "A"
}
]
}
]
}
IG © 2020+ HL7 International - Vocabulary Work Group. Package hl7.terminology#5.2.0 based on FHIR 4.0.1. Generated 2023-07-17
Links: Table of Contents |
QA Report
| Version History |
|
Propose a change