HL7 Terminology (THO)
3.1.0 - Publication International flag

This page is part of the HL7 Terminology (v3.1.0: Release) based on FHIR R4. The current version which supercedes this version is 5.2.0. For a full list of available versions, see the Directory of published versions

ValueSet: ActRelationshipOverlapsWith

Official URL: http://terminology.hl7.org/ValueSet/v3-ActRelationshipOverlapsWith Version: 2.0.0
Active as of 2014-03-26 Computable Name: ActRelationshipOverlapsWith
Other Identifiers: : urn:oid:2.16.840.1.113883.1.11.20406

References

This value set is not used here; it may be used elsewhere (e.g. specifications and/or implementations that use this content)

Logical Definition (CLD)

 

Expansion

This value set contains 15 concepts

Expansion based on ActRelationshipType v3.1.0 (CodeSystem)

All codes in this table are from the system http://terminology.hl7.org/CodeSystem/v3-ActRelationshipType

CodeDisplayDefinition
OVERLAPoverlaps withA relationship in which the source act's effective time overlaps the target act's effective time in any way. *UsageNote:* This code is reflexive. Therefore its inverse code is itself.
ECWends concurrent withA relationship in which the source act's effective time ends with the end of the target act's effective time. *UsageNote:* This code is reflexive. Therefore its inverse code is itself.
CONCURRENTconcurrent withA relationship in which the source act's effective time is the same as the target act's effective time. *UsageNote:* This code is reflexive. Therefore its inverse code is itself.
SBSECWEstarts before start of, ends withThe source Act starts before the start of the target Act, and ends with the target Act. *UsageNote:* Inverse code is **SASECWE**
EDUends duringA relationship in which the source act ends within the target act's effective time (including end points, as defined in the act's effective times) *UsageNote:* Inverse code is **SBEEAE**
SBSEASEBEcontains start of, ends before end ofThe source Act contains the start of the target Act, and ends before the end of the target Act. *UsageNote:* Inverse code is **SASSBEEAS**
SCWSEBEstarts with. ends before end ofThe source Act starts with.the target Act and ends before the end of the target Act. *UsageNote:* Inverse code is **SCWSEAE**
SBEEAEcontains end ofThe source Act contains the end of the target Act. *UsageNote:* Inverse code is **EDU**
SASSBEEASstart after start of, contains end ofThe source Act start after the start of the target Act, and contains the end of the target Act. *UsageNote:* Inverse code is **SBSEASEBE**
SBSEAEcontains time ofThe source Act contains the time of the target Act. *UsageNote:* Inverse code is **DURING**
SCWSEAEstarts with, ends after end ofThe source Act starts with the target Act, and ends after the end of the target Act.
SBSEAScontains start ofThe source Act contains the start of the target Act. *UsageNote:* Inverse code is **SDU**
SCWstarts concurrent withA relationship in which the source act's effective time starts with the start of the target act's effective time. *UsageNote:* This code is reflexive. Therefore its inverse code is itself.
SCWEstarts concurrent with end ofThe source Act starts when the target act ends (i.e. if we say "ActOne SCWE ActTwo", it means that ActOne starts when ActTwo ends, therefore ActOne is the source and ActTwo is the target). *UsageNote:* Inverse code is **SBSECWS**
SDUstarts duringA relationship in which the source act starts within the target act's effective time (including end points, as defined in the act's effective times) *UsageNote:* Inverse code is **SBSEAS**

Explanation of the columns that may appear on this page:

Level A few code lists that FHIR defines are hierarchical - each code is assigned a level. In this scheme, some codes are under other codes, and imply that the code they are under also applies
System The source of the definition of the code (when the value set draws in codes defined elsewhere)
Code The code (used as the code in the resource instance)
Display The display (used in the display element of a Coding). If there is no display, implementers should not simply display the code, but map the concept into their application
Definition An explanation of the meaning of the concept
Comments Additional notes about how to use the code

History

DateActionAuthorCustodianComment
2020-05-06reviseTed KleinVocabulary WGMigrated to the UTG maintenance environment and publishing tooling.
2014-03-26reviseVocabulary (Woody Beeler) (no record of original request)2014T1_2014-03-26_001283 (RIM release ID)Lock all vaue sets untouched since 2014-03-26 to trackingId 2014T1_2014_03_26