This page is part of the HL7 Terminology (v1.0.0: Release) based on FHIR R4. The current version which supercedes this version is 5.2.0. For a full list of available versions, see the Directory of published versions
Source view
{ "resourceType" : "CodeSystem", "id" : "v2-0472", "text" : { "status" : "generated", "div" : "<div xmlns=\"http://www.w3.org/1999/xhtml\"><h2>tqConjunctionId</h2><div><p>HL7-defined code system of concepts specifying that a second timing specification is to follow using the repeat delimiter. Used in HL7 Version 2.x messaging in the TQ1 segment.</p>\n</div><p><b>Copyright Statement:</b> Copyright HL7. Licensed under creative commons public domain</p><p><b>Properties</b></p><table class=\"grid\"><tr><td><b>Code</b></td><td><b>URL</b></td><td><b>Description</b></td><td><b>Type</b></td></tr><tr><td>status</td><td>http://terminology.hl7.org/CodeSystem/utg-concept-properties#status</td><td>Status of the concept</td><td>code</td></tr><tr><td>deprecated</td><td>http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-table-deprecated</td><td>Version of HL7 in which the code was deprecated</td><td>code</td></tr><tr><td>v2-concComment</td><td>http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concComment</td><td>V2 Concept Comment</td><td>string</td></tr><tr><td>v2-concCommentAsPub</td><td>http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentAsPub</td><td>V2 Concept Comment As Published</td><td>string</td></tr></table><p>This code system http://terminology.hl7.org/CodeSystem/v2-0472 defines the following codes:</p><table class=\"codes\"><tr><td style=\"white-space:nowrap\"><b>Code</b></td><td><b>Display</b></td><td><b>Definition</b></td><td><b>V2 Table Status</b></td><td><b>V2 Concept Comment</b></td><td><b>V2 Concept Comment As Published</b></td></tr><tr><td style=\"white-space:nowrap\">S<a name=\"v2-0472-S\"> </a></td><td>Synchronous</td><td>Synchronous</td><td>A</td><td>Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.</td><td>Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.</td></tr><tr><td style=\"white-space:nowrap\">A<a name=\"v2-0472-A\"> </a></td><td>Asynchronous</td><td>Asynchronous</td><td>A</td><td>Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.</td><td>Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.</td></tr><tr><td style=\"white-space:nowrap\">C<a name=\"v2-0472-C\"> </a></td><td>Actuation Time</td><td>Actuation Time</td><td>A</td><td>It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).</td><td>It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).</td></tr></table></div>" }, "extension" : [ { "url" : "http://hl7.org/fhir/StructureDefinition/structuredefinition-wg", "valueCode" : "oo" } ], "url" : "http://terminology.hl7.org/CodeSystem/v2-0472", "identifier" : [ { "system" : "urn:ietf:rfc:3986", "value" : "urn:oid:2.16.840.1.113883.18.300" } ], "version" : "2.1.0", "name" : "TqConjunctionId", "title" : "tqConjunctionId", "status" : "active", "experimental" : false, "date" : "2019-12-01T00:00:00-05:00", "publisher" : "HL7, Inc", "contact" : [ { "telecom" : [ { "system" : "url", "value" : "http://www.hl7.org/" } ] } ], "description" : "HL7-defined code system of concepts specifying that a second timing specification is to follow using the repeat delimiter. Used in HL7 Version 2.x messaging in the TQ1 segment.", "purpose" : "Underlying Master Code System for V2 table 0472 (TQ Conjunction ID)", "copyright" : "Copyright HL7. Licensed under creative commons public domain", "caseSensitive" : true, "valueSet" : "http://terminology.hl7.org/ValueSet/v2-0472", "hierarchyMeaning" : "is-a", "compositional" : false, "versionNeeded" : false, "content" : "complete", "property" : [ { "code" : "status", "uri" : "http://terminology.hl7.org/CodeSystem/utg-concept-properties#status", "description" : "Status of the concept", "type" : "code" }, { "code" : "deprecated", "uri" : "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-table-deprecated", "description" : "Version of HL7 in which the code was deprecated", "type" : "code" }, { "code" : "v2-concComment", "uri" : "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concComment", "description" : "V2 Concept Comment", "type" : "string" }, { "code" : "v2-concCommentAsPub", "uri" : "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentAsPub", "description" : "V2 Concept Comment As Published", "type" : "string" } ], "concept" : [ { "id" : "4869", "code" : "S", "display" : "Synchronous", "definition" : "Synchronous", "property" : [ { "code" : "v2-concComment", "valueString" : "Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An \"S\" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day." }, { "code" : "v2-concCommentAsPub", "valueString" : "Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An \"S\" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day." }, { "code" : "status", "valueCode" : "A" } ] }, { "id" : "4870", "code" : "A", "display" : "Asynchronous", "definition" : "Asynchronous", "property" : [ { "code" : "v2-concComment", "valueString" : "Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of \"A\" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday." }, { "code" : "v2-concCommentAsPub", "valueString" : "Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of \"A\" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday." }, { "code" : "status", "valueCode" : "A" } ] }, { "id" : "4871", "code" : "C", "display" : "Actuation Time", "definition" : "Actuation Time", "property" : [ { "code" : "v2-concComment", "valueString" : "It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported)." }, { "code" : "v2-concCommentAsPub", "valueString" : "It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported)." }, { "code" : "status", "valueCode" : "A" } ] } ] }